Victron Energy Super Pack

The batteries are easy to install, not needing any additional components. Integrated BMS and safety switch will disconnect the battery in case of over discharge, over charge or high temperature. The batteries can be connected in parallel. Series connection is not allowed. Installations can be operated with conventional electronic devices for lead batteries.

Grid List

Set Descending Direction

2 Item(s)

Grid List

Set Descending Direction

2 Item(s)